September 2006 - January 2007

SCA HYGEINE PRODUCTS LTD (PRUDHOE)

Water Treatment & DEINK Plant

E & I Design \ Commissioning


Responsible for the design to incorporate new field instrumentation into an existing Siemens PLC \ InTouch SCADA control system. The project also involved the construction of new PID, Motor and Valve faceplates within the SCADA system for new Air dissolvers on an existing Krofta Clarifier and  improvements to chemical dosing control on the Effluent Treatment Plant.

March 2014 - August 2014

IGGESUND PAPERBOARD (WORKINGTON) LTD

New 11kV Switchboard to incorporate New Bio Mass Plant

E & I Design


Responsible for the design of the Intertripping and IEC Bus Fibre networks. This primarily involved the ‘control’ element of incorporating a new ABB 11kV Switchboard into the mill’s existing 11kV Network.  This extended to the integration of new intertripping relays on the mill’s existing 11kV Switchboards.

September 2011 - June 2012

IGGESUND PAPERBOARD (WORKINGTON) LTD

Effluent Treatment Plant - Metso DNA DCS Installation

E & I Design


Responsible for the E & I Installation Design, incorporating New MCC, marshalling panels, air distribution panels, solenoid boxes and Metso DCS cabinets. The design also incorporated written specifications for the MCC, Fibre networks, Instrument and Electrical Installation.

Projects

LAFARGE CEMENT (CAULDON WORKS)

Waste Derived Liquid Fuel Plant

E & I Design


Responsible for the E & I installation design for a fuel offloading facility at Cauldon Works.  This incorporated a new ABB MCC, Mono Pumps MCC, Field Remote I\O and Solenoid Valve Panels. This also involved the design of the Profibus DP Fibre and Copper Networks and a Profibus PA hazardous area network.

July 2012 - June 2013

April 2009 - August 2009

IGGESUND PAPERBOARD (WORKINGTON) LTD

ABB LV Arc Detection System

E & I Design


Responsible for the design and installation of an Arc Detection Control Panel and its associated Sensors, Protection Relays, Expansion Modules and CAT5 Network.  This system was retrofitted to an existing LV MCC to trip the incomer on detection of a fault.

July 2013 - September 2013

October 2013 - February 2014

SALT UNION LTD (WINSFORD MINE)

Rock Salt Crushing Plant 

E & I Design \ Commissioning


Responsible for the E & I Design and Installation of a crushing plant for 10mm rock salt. This involved the design and installation of a bespoke MCC and integration with the mines existing control system. This also involved a challenging installation due to the location 165 metres beneath ground and the use of a catenary system for the cable containment.

December 2009 - March 2010

IGGESUND PAPERBOARD (WORKINGTON) LTD

Sodium Bicarbonate Control System

E & I Design \ SCADA Configuration \ Commissioning


Responsible for the design of a Siemens S7-300 PLC Control Panel,  the E & I Installation Design and the software engineering of a Siemens WINCC 7 SCADA application. This also involved the onsite commissioning of the electrical installation, control system and its associated Ethernet network.


Electrical, Control & Instrumentation Design

Additional Project Information

Available on Request

IGGESUND PAPERBOARD (WORKINGTON) LTD

11kV Substations Remote I\O Panels

E & I Design \ SCADA Configuration \ Commissioning


Responsible for the E & I Installation Design of 6 Off Siemens S7-300 Remote I\O Field panels complete with multi drop Fibre Profibus network.  This also involved the software engineering for the Siemens OP270 HMI’s and the integration into the mills existing Siemens PCS7 drives monitoring system.

August 2009 - December 2009

NORBORD LTD (INVERNESS)

Proposed OSB Plant

E & I Design


Involved with the electrical design for a new particle board plant to be constructed in Inverness.  The design to ascertain detailed budget costs incorporated Single Line Diagrams, Cable Block Diagrams, Location drawings, IEC Bus Network drawings, LV & HV MCC Type Circuits and equipment specifications.

February 2009 - April 2009

ROBERT McBRIDE'S LTD (MIDDLETON)

Fragrance Addition PLC Control System

E & I Design \ PLC Configuration \ Commissioning


Responsible for the E & I Design and Installation of a Fragrance Addition system.  Also responsible for the development and Commissioning of the Siemens S7 ET200S PLC code and integration of the new equipment within the existing control system.

June 2005 - September 2005

July 2007 - February 2009

October 2005 - August 2006

IGGESUND PAPERBOARD (WORKINGTON) LTD

Raw Water Treatment Plant

E & I Design \ SCADA Configuration \ Commissioning


Responsible for the Control System Design, incorporating Siemens  S7 Remote I\O Field Boxes, ABB ACS800 VSD’s, Siemens Simocode motor managers and a Siemens WINCC 6.0 SCADA application.  This involved the software engineering of the WINCC 6.0 SCADA application and on site commissioning of the control system and associated process equipment.

May 2010 - August 2011

February 2007 - June 2007

March 2010 - May 2010

Some of the projects listed below were completed while Employed \ Sub-contracted by third part​ies

SCA HYGEINE PRODUCTS LTD (PRUDHOE)

Water Treatment & DEINK Plant Phase II Upgrade

E & I Design \ SCADA Configuration \ Commissioning


Responsible for the Control System Design, incorporating fibre \ copper Profibus network, Siemens S7 Remote I\O Field Boxes, ABB ACS800 VSD’s, Siemens Simocode motor managers and a multi Client SCADA application.  This also involved the software engineering of a Wonderware InTouch 10 server \ client SCADA system and on site commissioning of the control system, associated networks and process equipment.

POWRY ENERGY LTD (WARRINGTON)

QVF Mixer Control System (ATEX)

E & I Design


Responsible for the QVF Mixer Control Panels and E & I installation design, incorporating field barriers and hazardous area instrumentation. Producing schematic diagrams, general arrangements, cable block diagrams, termination schedules, pneumatic schedules, routing drawings and intrinsic safety calculations etc.

IGGESUND PAPERBOARD (WORKINGTON) LTD

Coating Plant Upgrade \ PW4A Drive Replacement

E & I Design \ Commissioning


Responsible for the E & I design and installation, incorporating MCC, field marshalling, air distribution & solenoid box designs. On site commissioning of complete installation back to Honeywell TDC3000 DCS system.  The project also incorporated the installation of a new ABB ACS550 Inverter drive, replacement of the existing DC motor and the removal of the redundant DC Drives cabinet and associated cabling.

LAFARGE CEMENT (CAULDON WORKS)

Limestone Quarry ABB DCS, PFA Blending Plant & Kiln Feed System 

E & I Design \ Commissioning


Site based and responsible for the E & I Installation design and commissioning of a number projects at Cauldon Works.  These projects involved the design and installation of new ABB MCC’s, Field Remote I\O and Solenoid Valve Panels. The role also involved managing the electrical sub-contractors and responsibility for delivering the E & I content of the projects on time.

BRIDGEWATER PAPER (ELLESMERE PORT)

Winder Guards & Nalco Chemical Rigs

E & I Design \ Commissioning


Site based and responsible for the E & I Installation design and commissioning of a number of smaller projects at Bridgewater Paper. These included the installation of Winder Guards Safety Circuits, Nalco Chemical Rigs and Additional DCS Marshalling.